| Building HousesThe following information is required when applying for a Building Permit to construct a new home
The plot plan should show the following; setbacks from lot lines, any drainage swales and ditches, location of well and sewage system or location of buried service entrances, hydro services, bell and cable services, driveway The following plans are required when making the application
This information is required in order to conduct a proper plan review. This plan review is beneficial in that building code deficiencies can be detected before you have paid for them. It is also important to indicate on the plans wether there will be a deck constructed or if you plan on constructing it later under another building permit. Also required to be completed
These forms are included in the application package. The HVAC design summary is required prior to construction so that compliance with section 9.32 of the OBC can be determined. The ONHWP declaration is required to verify compliance with section 8.-(2)of the Ontario Building Code Act. Houses requiring on-site sewage disposal systems
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||